Determining if a particular date is a holiday is a global
problem that has several solutions among iSeries shops. Some shops set up a
calendar file of some sort, keyed by date, with a field flagging it as a
holiday. This is OK, as long as you remember to generate it every year. I prefer
a program that receives a date, of any year, and determines if it is a holiday.
With an algorithmic program, you would not need to remember to generate new
records in a calendar file every year, and you wouldn't use up disk
space.
There are several things to consider when determining if a date is
a holiday:
Some holidays are dated--that is, they occur on a specific date,
such as 12/25, 11/11, 1/1 or 7/4. Sounds easy enough, but if they fall on the
weekend, your company may not observe them on their actual date. Then,
you have to determine when your company observes the holiday during the work
week.
Other holidays float--that is, they occur on the nth xxxday of a month, such
as the third Monday of January, the fourth Thursday of November, or, even
trickier, the last Monday of May.
Then there's Good Friday and Easter, but even that can be determined
algorithmically.
I have marveled at the lengths to which some
code goes to determine if a day is the nth xxxday of the month, sometimes
involving complicated comparison and counting calculations. I have seen similar
complex coding for determining observed holidays. I have discovered that such
complicated processing is not necessary. To determine if a date is a holiday,
you need only two pieces of information:
1. The date itself (specifically
the month and day) 2. The day of the week
For dated
holidays like 7/4, 11/11 and 12/25, the actual date is the holiday. If that
holiday falls during the work week, you're set. But if it falls on the weekend,
you have everything you need to determine when the holiday might be observed by
your company during the work week. Normally, if a holiday falls on Saturday, it
is observed on Friday; likewise, a Sunday or Tuesday holiday is observed on
Monday. You can then deduce, for example, that Friday, 7/3, or Monday, 7/5, and
so on, could be observed holidays.
Floating holidays are just as easy to
determine. There is one simple fact to keep in mind when determining if a date
is the nth xxxday, and this fact is easy to overlook: There are only seven
xxxdays (Monday through Sunday). It follows then that the first xxxday of the
month will be on one of the first seven days. We can now determine easy ranges
of seven days that we need.
Nth Range
Days
Use for...
1st xxxday
1 to 7
Labor Day (1st Monday in September)
2nd xxxday
8 to 14
Columbus Day (2nd Monday in October)
3rd xxxday
15 to 21
Martin Luther King Day (3rd Monday in January) President's
Day (3rd Monday in February)
4th xxxday
22 to 28
Thanksgiving (4th Thursday in November)
5th xxxday
29 to 31
Last xxxday
25 to 31
Memorial Day (Last Monday in May)
If you have a September Monday between 9/1 and 9/7, then you have Labor
Day. If you have a November Thursday between 11/22 and 11/28, it is
Thanksgiving. Likewise, a May Monday between 5/25 and 5/31 is Memorial Day.
Other useful ranges are 11/23 through 11/29 to determine the Friday
after Thanksgiving (that Friday will follow the fourth Thursday), and 11/2
through 11/8 to determine Election Day (the first Tuesday in November on or
after 11/2).
As for Easter and Good Friday, there is an accepted
algorithm called the Mallen
Algorithm. It is easy to implement in RPG, COBOL, or Java. Remember also
that Easter will always fall somewhere between 3/22 and 4/25.
Now, what
about calculating a holiday date? In other words, how would you code a function
to answer "When is Thanksgiving in 2002?"
For dated holidays, that's
easy. You already know the answer. "When is Christmas in 1999?" 12/25/1999, of
course. If this falls on the weekend or even the middle of the week, when might
your company observe it? This involves some work, but not much. Simply
determine the day of week of the dated holiday. If it is 6 (Saturday), subtract
a day from the date. For 7 (Sunday), add a day. In 1999, Christmas is on
Saturday, so it is observed Friday, 12/24/1999.
For the floating
holidays, it's not that difficult, either. We need the following
information:
The month and year. We know these already.
x: The xxxday we are looking for. For Thanksgiving, x would be 4
(Thursday)
d: The first day of the range. For Thanksgiving, d would be 22, because the
fourth Thursday falls somewhere between the 22nd and the
28th.
n: The day of the week that d falls on, for the given month and
year.
Now, to determine h, the day the holiday falls on, we use
the following formula:
if (n <= x); h = d + (x - n); else h = d + ((x + 7) - n); endif;
So for Thanksgiving in 2003, we have:
Month and Year: 11/2003
x = 4
d = 22
n = Weekday of 11/22/2003 = 6 (Saturday)
h = 22 + ((4 + 7)
- 6) h = 22 + (11 - 6) h = 22 + 5 h =
27
Thanksgiving in 2003 is 11/27.
The sample program below
receives a date (numeric CYMD) and determines if it is a holiday. If it is, it
returns a code indicating which holiday as well as a text description of the
holiday.
Doug Eckersley is the iSeries
programmer with a homebuilder in Columbus, Ohio. He has been programming on the
AS/400 for ten years. He is certified by IBM. He can be reached by email
at This email address is being protected from spambots. You need JavaScript enabled to view it..
***************************************************************** * * * Program - UTRSHD00 * * Module - None Release - ?.?? * * * * Narrative : Determine if a passed in date is a holiday. * * * * Pass in an instruction in outCode to check for * * certain holidays: * * * * *MAJ: Check for major holidays only: * * New Year, Memorial, Independence, * * Labor, Thanksgiving, Christmas. * * * * *FED: Check for *MAJ holidays and also: * * Martin Luther King, Presidents', * * Columbus and Veterans'. * * * * xxxx: Check for the specific holiday. * * * ***************************************************************** ********------------ Program Maintenance Log ------------******** ***************************************************************** * Personnel | Date | Comments/Description * *------------|----------|---------------------------------------* * MDE | 06/18/02 | Program Written * * | | * *****************************************************************
D*===================================================================== D* Parameters D*===================================================================== D inDate S 8S 0 D outCode S 4A D outDesc S 40A D D*===================================================================== D* Switches D*===================================================================== D*Switches DS D D*===================================================================== D* Other Work D*===================================================================== D Instruction S LIKE(outCode) D D DS D hx 2S 0 D Holidays 44A DIM(15) CTDATA PERRCD(1) D hCode 4A OVERLAY(Holidays:*NEXT) D hDesc 40A OVERLAY(Holidays:*NEXT) D D DS D wData 1 9S 0 D wDate 1 8S 0 D wY 1 4S 0 D wDay 5 9S 0 D wMD 5 8S 0 D wM 5 6S 0 D wD 7 8S 0 D wW 9 9S 0 D D DS D cDate D DATFMT(*ISO) D Dur 9S 0 D D*--------------------------------------------------------------------- D* Good Friday Work Area - Mallen Algorithm D*--------------------------------------------------------------------- D DS D gf 1 4S 0 D gfM 1 2S 0 D gfD 3 4S 0 D D FirstDig S 9S 0 D Remain19 S 9S 0 D temp S 9S 0 D tA S 9S 0 D tB S 9S 0 D tC S 9S 0 D tD S 9S 0 D tE S 9S 0
C********************************************************************** C********************************************************************** C *entry plist C parm inDate C parm outCode C parm outDesc C C exsr $inzsr C exsr $Main C C eval *inlr = *on C*===================================================================== C $inzsr begsr C*===================================================================== C eval Instruction = outCode C C eval wDate = inDate C clear outCode C clear outDesc C C xinzsr endsr C*===================================================================== C $Main begsr C*===================================================================== C*--------------------------------------------------------------------- C* Make Date a Date Field C*--------------------------------------------------------------------- C *ISO test(de) wDate C if %error C leavesr C endif C *ISO move wDate cDate C C*--------------------------------------------------------------------- C* Get Day of Week: 1=Monday...7=Sunday C*--------------------------------------------------------------------- C cDate SUBDUR d'0001-01-01' Dur:*D C eval wW = %rem(Dur:7) + 1 C C* Skip weekends C if wW >= 6 C leavesr C endif C C*--------------------------------------------------------------------- C* Determine if this is a holiday C*--------------------------------------------------------------------- C exsr $Holiday C C*--------------------------------------------------------------------- C* Load description C*--------------------------------------------------------------------- C if hx = *zero C leavesr C endif C C if (Instruction <> *blanks) C and (%subst(Instruction:1:1) <> '*') C and (Instruction <> hCode(hx)) C leavesr C endif C C eval outCode = hCode(hx) C eval outDesc = hDesc(hx) C C xMain endsr C*===================================================================== C $Holiday begsr C*===================================================================== C eval hx = *zero C C* Major Holidays first C*--------------------------------------------------------------------- C* New Years - Jan 1 C*--------------------------------------------------------------------- C if (wMD = 0101) C or (wDay = 01021) C or (wDay = 12315) C eval hx = 1 C leavesr C endif C C*--------------------------------------------------------------------- C* Memorial Day - Last Mon in May C*--------------------------------------------------------------------- C if (wW = 1) C and (wMD >= 0525) C and (wMD <= 0531) C eval hx = 2 C leavesr C endif C C*--------------------------------------------------------------------- C* Independence Day - Jul 4 C*--------------------------------------------------------------------- C if (wMD = 0704) C or (wDay = 07035) C or (wDay = 07051) C eval hx = 3 C leavesr C endif C C*--------------------------------------------------------------------- C* Labor Day - 1st Mon in Sep C*--------------------------------------------------------------------- C if (wW = 1) C and (wMD >= 0901) C and (wMD <= 0907) C eval hx = 4 C leavesr C endif C C*--------------------------------------------------------------------- C* Thanksgiving - 4th Thu in Nov C*--------------------------------------------------------------------- C if (wW = 4) C and (wMD >= 1122) C and (wMD <= 1128) C eval hx = 5 C leavesr C endif C C*--------------------------------------------------------------------- C* Christmas - Dec 25 C*--------------------------------------------------------------------- C if (wMD = 1225) C or (wDay = 12245) C or (wDay = 12261) C eval hx = 6 C leavesr C endif C C*--------------------------------------------------------------------- C*--------------------------------------------------------------------- C* If looking for Major Holiday only, leave now C*--------------------------------------------------------------------- C*--------------------------------------------------------------------- C if Instruction = '*MAJ' C leavesr C endif C C*--------------------------------------------------------------------- C* MLK - 3rd Mon in Jan C*--------------------------------------------------------------------- C if (wW = 1) C and (wMD >= 0115) C and (wMD <= 0121) C eval hx = 7 C leavesr C endif C C*--------------------------------------------------------------------- C* Presidents' Day - 3rd Mon in Feb C*--------------------------------------------------------------------- C if (wW = 1) C and (wMD >= 0215) C and (wMD <= 0221) C eval hx = 8 C leavesr C endif C C*--------------------------------------------------------------------- C* Columbus Day - 2nd Mon in Oct C*--------------------------------------------------------------------- C if (wW = 1) C and (wMD >= 1008) C and (wMD <= 1014) C eval hx = 9 C leavesr C endif C C*--------------------------------------------------------------------- C* Veterans' Day - Nov 11 C*--------------------------------------------------------------------- C if (wMD = 1111) C or (wDay = 11105) C or (wDay = 11121) C eval hx = 10 C leavesr C endif C C*--------------------------------------------------------------------- C*--------------------------------------------------------------------- C* If looking for Federal Holiday only, leave now C*--------------------------------------------------------------------- C*--------------------------------------------------------------------- C if Instruction = '*FED' C leavesr C endif C C*--------------------------------------------------------------------- C* Thanksgiving Friday - Fri after Thanksgiving C*--------------------------------------------------------------------- C if (wW = 5) C and (wMD >= 1123) C and (wMD <= 1129) C eval hx = 11 C leavesr C endif C C*--------------------------------------------------------------------- C* Election Day - 1st Tue on/after Nov 2 C*--------------------------------------------------------------------- C if (wW = 2) C and (wMD >= 1102) C and (wMD <= 1108) C eval hx = 12 C leavesr C endif C C*--------------------------------------------------------------------- C* Good Friday - Special Calculation C*--------------------------------------------------------------------- C exsr $GoodFriday C if hx > *zero C leavesr C endif C C xHoliday endsr C*===================================================================== C $GoodFriday begsr C* This subroutine calculates the date of Good Friday using the C* Mallen Algorithm of Easter date calculation (Good Friday is C* two days before Easter). C* C* See www.assa.org.au/edm.html for information regarding C* the Mallen Algorithm. C*===================================================================== C*--------------------------------------------------------------------- C* Is passed in date in range for Good Friday? C*--------------------------------------------------------------------- C if (wMD < 0320) C or (wMD > 0423) C leavesr C endif C C*--------------------------------------------------------------------- C* Calculate Paschal Full Moon Date C*--------------------------------------------------------------------- C eval FirstDig = %div(wY:100) C eval Remain19 = %rem(wY:19) C C eval temp = %div((FirstDig - 15):2) C + 202 - (11 * Remain19) C C select C when (FirstDig = 21) C or (FirstDig = 24) C or (FirstDig = 25) C or (FirstDig = 27) C or (FirstDig = 28) C or (FirstDig = 29) C or (FirstDig = 30) C or (FirstDig = 31) C or (FirstDig = 32) C or (FirstDig = 34) C or (FirstDig = 35) C or (FirstDig = 38) C eval temp = temp - 1 C C when (FirstDig = 33) C or (FirstDig = 36) C or (FirstDig = 37) C or (FirstDig = 39) C or (FirstDig = 40) C eval temp = temp - 2 C endsl C eval temp = %rem(temp:30) C C eval tA = temp + 21 C if temp = 29 C eval tA = tA - 1 C endif C if (temp = 28) C and (Remain19 > 10) C eval tA = tA - 1 C endif C C*--------------------------------------------------------------------- C* Get Easter C*--------------------------------------------------------------------- C eval tB = %rem((tA - 19):7) C C eval tC = %rem((40 - FirstDig):4) C if tC = 3 C eval tC = tC + 1 C endif C if tC > 1 C eval tC = tC + 1 C endif C C eval temp = %rem(wY:100) C eval tD = %rem(temp+%div(temp:4):7) C C eval tE = %rem((20-tB-tC-tD):7) + 1 C C eval gfD = tA + tE C C* Two days earlier - Good Friday: C eval gfD = gfD - 2 C C eval gfM = 3 C if gfD > 31 C eval gfD = gfD - 31 C eval gfM = 4 C endif C C*--------------------------------------------------------------------- C* Now compare to passed in date. C* C* Because of the special calc for Good Friday, we want to do it C* last. Therefore, it's entry in the table will always be the C* last entry. C*--------------------------------------------------------------------- C if wMD = gf C eval hx = %elem(Holidays) C endif C C xGoodFriday endsr
**CTDATA Holidays NY New Year's Day MEM Memorial Day ID4 Independence Day LAB Labor Day THK Thanksgiving XMASChristmas MLK Martin Luther King Day PRESPresidents' Day COL Columbus Day VET Veterans' Day THKFThanksgiving Friday ELECElection Day **** **** GF Good Friday
This book provides an amazingly comprehensive introduction to the concepts while at the same time delivering enough technical detail to make you productive very quickly.
Today, it's all about input and output. Getting data into the IBM i from non-traditional sources and then displaying it back out again in varied formats. But where can you go to learn all that you need to know about this critical skill?
Too valuable to be classified as merely excellent certification material, this book should also rightly take its place on DB2 DBA bookshelves as a solid day-to-day DB2 reference.
Whether you want to obtain an IBM certified DB2 professional certification or simply become well-rounded in the fundamental concepts of DB2 and general database theory, this is your book.
Have you been wondering about Node.js? Our free Node.js Webinar Series takes you from total beginner to creating a fully-functional IBM i Node.js business application. You can find Part 1 here. In Part 2 of our free Node.js Webinar Series, Brian May teaches you the different tooling options available for writing code, debugging, and using Git for version control. Brian will briefly discuss the different tools available, and demonstrate his preferred setup for Node development on IBM i or any platform. Attend this webinar to learn:
More than ever, there is a demand for IT to deliver innovation. Your IBM i has been an essential part of your business operations for years. However, your organization may struggle to maintain the current system and implement new projects. The thousands of customers we've worked with and surveyed state that expectations regarding the digital footprint and vision of the company are not aligned with the current IT environment.
IBM announced the E1080 servers using the latest Power10 processor in September 2021. The most powerful processor from IBM to date, Power10 is designed to handle the demands of doing business in today’s high-tech atmosphere, including running cloud applications, supporting big data, and managing AI workloads. But what does Power10 mean for your data center? In this recorded webinar, IBMers Dan Sundt and Dylan Boday join IBM Power Champion Tom Huntington for a discussion on why Power10 technology is the right strategic investment if you run IBM i, AIX, or Linux. In this action-packed hour, Tom will share trends from the IBM i and AIX user communities while Dan and Dylan dive into the tech specs for key hardware, including:
TRY the one package that solves all your document design and printing challenges on all your platforms. Produce bar code labels, electronic forms, ad hoc reports, and RFID tags – without programming! MarkMagic is the only document design and print solution that combines report writing, WYSIWYG label and forms design, and conditional printing in one integrated product. Make sure your data survives when catastrophe hits. Request your trial now! Request Now.
Forms of ransomware has been around for over 30 years, and with more and more organizations suffering attacks each year, it continues to endure. What has made ransomware such a durable threat and what is the best way to combat it? In order to prevent ransomware, organizations must first understand how it works.
IT security is a top priority for businesses around the world, but most IBM i pros don’t know where to begin—and most cybersecurity experts don’t know IBM i. In this session, Robin Tatam explores the business impact of lax IBM i security, the top vulnerabilities putting IBM i at risk, and the steps you can take to protect your organization. If you’re looking to avoid unexpected downtime or corrupted data, you don’t want to miss this session.
Can you trust all of your users all of the time? A typical end user receives 16 malicious emails each month, but only 17 percent of these phishing campaigns are reported to IT. Once an attack is underway, most organizations won’t discover the breach until six months later. A staggering amount of damage can occur in that time. Despite these risks, 93 percent of organizations are leaving their IBM i systems vulnerable to cybercrime. In this on-demand webinar, IBM i security experts Robin Tatam and Sandi Moore will reveal:
Disaster protection is vital to every business. Yet, it often consists of patched together procedures that are prone to error. From automatic backups to data encryption to media management, Robot automates the routine (yet often complex) tasks of iSeries backup and recovery, saving you time and money and making the process safer and more reliable. Automate your backups with the Robot Backup and Recovery Solution. Key features include:
Managing messages on your IBM i can be more than a full-time job if you have to do it manually. Messages need a response and resources must be monitored—often over multiple systems and across platforms. How can you be sure you won’t miss important system events? Automate your message center with the Robot Message Management Solution. Key features include:
The thought of printing, distributing, and storing iSeries reports manually may reduce you to tears. Paper and labor costs associated with report generation can spiral out of control. Mountains of paper threaten to swamp your files. Robot automates report bursting, distribution, bundling, and archiving, and offers secure, selective online report viewing. Manage your reports with the Robot Report Management Solution. Key features include:
For over 30 years, Robot has been a leader in systems management for IBM i. With batch job creation and scheduling at its core, the Robot Job Scheduling Solution reduces the opportunity for human error and helps you maintain service levels, automating even the biggest, most complex runbooks. Manage your job schedule with the Robot Job Scheduling Solution. Key features include:
Business users want new applications now. Market and regulatory pressures require faster application updates and delivery into production. Your IBM i developers may be approaching retirement, and you see no sure way to fill their positions with experienced developers. In addition, you may be caught between maintaining your existing applications and the uncertainty of moving to something new.
When it comes to creating your business applications, there are hundreds of coding platforms and programming languages to choose from. These options range from very complex traditional programming languages to Low-Code platforms where sometimes no traditional coding experience is needed. Download our whitepaper, The Power of Writing Code in a Low-Code Solution, and:
Supply Chain is becoming increasingly complex and unpredictable. From raw materials for manufacturing to food supply chains, the journey from source to production to delivery to consumers is marred with inefficiencies, manual processes, shortages, recalls, counterfeits, and scandals. In this webinar, we discuss how:
The MC Resource Centers bring you the widest selection of white papers, trial software, and on-demand webcasts for you to choose from.
>> Review the list of White Papers, Trial Software or On-Demand Webcast at the MC Press Resource Center. >> Add the items to yru Cart and complet he checkout process and submit
Have you been wondering about Node.js? Our free Node.js Webinar Series takes you from total beginner to creating a fully-functional IBM i Node.js business application.
IT managers hoping to find new IBM i talent are discovering that the pool of experienced RPG programmers and operators or administrators with intimate knowledge of the operating system and the applications that run on it is small. This begs the question: How will you manage the platform that supports such a big part of your business? This guide offers strategies and software suggestions to help you plan IT staffing and resources and smooth the transition after your AS/400 talent retires. Read on to learn:
LATEST COMMENTS
MC Press Online